City beefs up its charging infrastructure for electric vehicles

York’s second electric vehicle HyperHub, next to Poppleton Park and Ride, is now officially open.

The site joins the Monks Cross HyperHub, which opened earlier this year and is one of the largest charging hubs in Northern England.

Both HyperHub sites contain four Ultra-Rapid (175kW) and four Rapid (50kW) vehicle chargers, helping to support the uptake of modern electric vehicles (EV) that have larger battery capacities and are capable of Ultra Rapid charging.

Poppleton features 4175kW ultra-rapid chargers (which can be upgraded to 350kW when vehicle charging rates make that worthwhile).

The HyperHub also has a solar canopy which allows the site to generate its own renewable energy which can be stored in the Tesla Powerpack batteries at the charging hub, helping to reinforce the grid.

The ultra-rapid chargers are user-friendly for EV drivers and offer contactless payment methods.

Protection from the weather is provided by the solar canopy and all of the electricity supplied from the National Grid will be generated by renewable sources.

The project is the result of a partnership between City of York Council and EvoEnergy.

Councillor Keith Aspden, leader of City of York Council, said: “York is now proud to be the home of one of the largest electric vehicle charging hubs in Northern England.

“Monks Cross Hyperhub has been hugely popular since it opened this year. Poppleton offers the same convenience, sustainability and speed.

“Our Electric Vehicle Charging Strategy and work with EvoEnergy are key to the success of this project. The HyperHubs are just the latest part of city wide work to support more sustainable travel and our efforts to make York cleaner and greener.”

Cllr Andy D’Agorne, deputy leader of City of York Council, said: “York’s HyperHubs will allow electric vehicle drivers to charge easily and quickly using renewable energy.

“This will help reduce emissions and improve York’s air quality, supporting our ambitions to become carbon neutral by 2030.

“Over the past few years, electric vehicle technology has progressed at pace, with many drivers switching to these next generation cars. To enable the use of electric vehicles the right infrastructure is crucial.”

Jonathan Roper, senior renewable energy consultant at EvoEnergy, added: “The HyperHub next to Poppleton Park and Ride, sister site to Monks Cross, with elements such as rapid and ultra-rapid chargers, solar energy generation and battery storage, is enabled by the solar and batteries installed onsite.

“The grid capacity in this location is limited, which could limit the number of people charging at the site simultaneously.

“With batteries being charged by solar energy, more people will be able to charge up at once in a hassle-free way, helping to reduce emissions from road transport in York.”

City of York Council secured £1m worth of European Regional Development Funding and £800,000 from the Office for Zero Emission Vehicles, along with £400,000 of the council’s own capital funding to install the first two HyperHubs.

Close