Major flood alleviation works under way at heavy engineering business site
A 1,050-feet long tunnel is being driven under Sheffield’s Brightside Lane, as Sheffield Forgemasters’ flood alleviation works reach a pivotal point.
The tunnel will connect two shafts, one more than 40-feet wide and the other more than 15-feet wide, both exceeding 35-feet deep, which have been installed at the engineering company’s site, with the first located on the North side of Brightside Lane and the second closer to the River Don.
Civil engineering specialist, JBA Bentley, is leading the project to intercept the Lowe... You can carry on reading TheBusinessDesk.com for free, but you have reached the maximum number of pages an unregistered user can view. To register for an account, click here or login below...