Shropshire manufacturer powers cabling solution on major London infrastructure project

A Shropshire manufacturer has won contracts worth nearly £350,000 in the second phase of a major infrastructure project to upgrade London’s power supply. Fabweld Steel Products (FSP), based in Telford, has secured orders totalling more than £346,000 for its bespoke cable brackets that will be used in a new network of underground cable tunnels in south London. The six-year London Power Tunnels 2 project, which started this summer, involves the construction of 32.5 km of cable tunnels running between Wimbledon and Crayford tha... You can carry on reading TheBusinessDesk.com for free, but you have reached the maximum number of pages an unregistered user can view. To register for an account, click here or login below...
Close